中文成人在线,99这里只有精品免费视频,国模视频一区二区,日本午夜三级,亚洲美女操,色偷偷一区,久热这里只有精品6,五月天香蕉视频国产亚
              Homepage      Favorite      中文版
            Home About Us News info Products Services Recruitment Contact us
            SERVICES
            Marketing
            After Services
            Question
            Downloads
            CONTACT US
            Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
            Tel: +86-592-6539999
            E-mail: bussiness@xmzzj.com

            Question
            Location:Home → Services → Question
            Drive axle maintenance
            Public date:2015-1-21   Hits:5141

            Drive axle in use, the parts can play normal function, and its maintenance is reasonable great relationship. In order to keep the product in good technical condition, extend the life of the product's features to better play, according to "regular maintenance" of the relevant provisions, time to check the oil level and replace the drive axle drive axle oil.

            Check the drive axle oil level

            1) the machine onto a flat open space, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug in the horizontal position. Because the drain plug while the front and rear drive axles can not be in a horizontal position, so the front and rear drive axle oil level should be checked twice.
            2) turn off the engine, the speed control lever in neutral position, the parking brake lever to the brake position to prevent the machine from moving.
            3) on both sides of the drive axle wheel area near the port plugs clean and remove oil drain plug observation, drive axle inside the oil level should be at the lower edge of the discharge port. If the oil level is below the lower edge of the discharge port, you should add the oil and clean the drive axle. After refueling should be observed for 5 minutes or so, if the oil level to remain stable.
            4) Screw on the oil drain plug.
            5) After the above operation drive axle oil level checks.

            Replace the drive axle oil, follow these steps:

            1) First start the machine running for some time, so the bridge shell impurities precipitate move to full suspension. Then the machine onto a flat open space, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug at the lowest position. Because the front and rear wheel drive axle end face of the drain plug at the lowest position can not simultaneously, so the front and rear axle to be carried out in multiple oil changes.
            2) turn off the engine, the speed control lever in neutral position, the parking brake lever to the brake position to prevent the machine from moving.
            3) Remove the front wheel drive axle axle drain plug and drain plug at both ends of the central plane, were put oil, and container connected.
            Note: Because this time the drive axle oil may be in a higher temperature, so to wear protective equipment, and careful to avoid personal injury.
            4) Remove the front drive axle in the middle of the oil drain plug.
            5) Start the engine, release the parking brake. Ⅰ gearbox hanging files, small throttle slowly moving the machine, so that the front wheel drive axle end face of the drain plug in the horizontal position. Then turn off the engine, gearbox hanging neutral, parking (hand) brake is braking.
            6) previously put the oil port side of the bridge to join the two ends wheel drive axle clean oil until the oil level reaches the ends of the front axle wheel rim surface discharge of oil. After refueling should be observed for 5 minutes or so, if the oil level to remain stable.
            7) Remove the front wheel drive axle drain plug at both ends.
            8) is similar to the process described above, after replacing the drive axle oil.

            Drive axle general maintenance should note the following items:

            1) regular cleaning grease, dirt and dust, especially vents to keep open. Fastening check all parts, focusing on the main reduction gear reducer and wheel rim bolts, if loose fastening must be timely.
            2) Always check whether there is leakage of the various parts, if found, should be timely maintenance excluded. Check the main gear wheel reducer and lubricating oil level within the time to add, keep the oil level requirements to ensure proper operation.
            3) The first oil change: After the first 250 hours of work in the first month or; cycle oil change: every six months or every work after 1000 hours.
            4) Check the main reducer shell (bay), wheel cover at the phenomenon has no unusual fever, if fever, you should check the oil level is in line with requirements.
            5) Check the work process has no unusual sounds, such as the discovery should stop excluded.
            6) Check the brake disc wear, with or without the presence of destructive wear, if found should be immediately removed.
            Wear 7) Check the brake pads when the friction plate on the worn grooves no longer meet the requirements should be replaced immediately.

            Previous  |  Next  |   Return to
            About Us
            Company profile
            Culture
            Organizational
            Development
            Subsidiaries
            Certificates
            Products
            Wheel Loader
            Block Handling Wheel Loader
            Excavator
            Other
            Spare Parts
            News
            Company News
            Trade News
            Exhibitions
            Videos
            Services
            Marketing
            After Services
            Question
            Downloads
            Recruitment
            Talent Concept
            Jobs
            Contact Us
            Feedback
            Contact us
            Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
            Two-dimensional [Close]

            點擊這里給我發(fā)消息
            點擊這里給我發(fā)消息
            主站蜘蛛池模板: 成人精品视频一区二区在线| 亚洲一区二区约美女探花| 国产一区二区不卡自拍| a级毛片在线免费观看| 蜜臀AVWWW国产天堂| 五月丁香啪啪| 亚洲夂夂婷婷色拍ww47| 亚洲中文精品一区二区| 国产美女免费| 国产性精品| 日韩毛片免费| 欧美巨大极度另类| 一卡二卡三卡四卡视频区| 精品一区二区亚洲国产| 亚洲国产超清无码专区| 亚洲国产欧美一区二区好看电影| 成人无码午夜在线观看| 人妻丝袜无码专区视频网站| 成人午夜激情在线观看| 69天堂人成无码免费视频| 日韩午夜伦| 国内精品伊人久久久久7777人| 精品少妇av蜜臀av| av中文字幕在线二区| 91免费国产在线观看尤物| 精品国产中文一级毛片在线看| 欧美高清国产| 中文字幕人妻无码一夲道| 99精品热在线在线观看视| 97国产在线观看| 99这里只有精品免费视频| 激情综合色综合啪啪开心| 99久久国产成人免费网站| 伊人久久大香线蕉成人综合网| 国产小视频免费| 国内精品免费久久久久电影院97| 人妻中文字幕不卡精品| 亚洲AV一二三区无码AV蜜桃| 精品无码成人片一区二区| 97久久免费视频| 天堂中文8资源在线8|